Our architectural grade exterior wall sconces are made in the USA to withstand the harshest weather environments. They are finished using an industrial grade primer and architectural finish designed for harsh exterior use. ALVA’s outdoor light fixtures are designed from the inception to be illuminated with state-of-the-art LED technology. This design approach allows ALVA toRead More ›
Category: Case Study
The Right LED Solution for the Fant-Ewing Coliseum
OVERVIEWWhen the Warhawks take the floor this season, Players, Spectators, and Fans at home will have a brand-new experience. They will be able to view the Coliseum in a whole new light due to the AEON Sports Lighting Retrofit that took place over the summer. The University of Louisiana- Monroe replaced the traditional 104 PCSRead More ›
Emerson Helps Reduce Light Pollution in Permian Basin with Appleton LED Floodlights
SPANNING WEST TEXAS TO SOUTHEASTERN NEW MEXICO, the Permian Basin is one of the most prolific oil and natural gas geologic basins in the United States. Besides its famed energy reserves, the Permian Basin is also valued by astronomers for its pitch-black night skies, a natural phenomenon that has been threatened in recent years byRead More ›
Manual Work Meets Modern Automation to Empower Workers with Handicaps
IN SPITE OF ADVANCING DIGITALIZATION, the following still applies: Manual workstations are indispensable, be- cause automation is not always profitable with small batch quantities or complex processes. Such workstations are preferred at the Martinshof Werkstatt Bremen, a sheltered workshop for a mixed workforce including people with handicaps, as they are ideally suited for integrating personsRead More ›
Hospital Retrofit with Wiremold® Raceway & Device Boxes
The Challenge: The Geisinger Health System serves more than 2.6 million residents in central and northeastern Pennsylvania. When the integrated health services organization acquired Community Medical Center (CMC) in Scranton, it faced a huge $80 million project to improve the 232-bed hospital. Among the changes, a top priority was upgrading the wire and cable infrastructure.Read More ›